22 Years' Battery Customization

What is a battery simulator?

Feb 05, 2019   Pageview:659

As a new generation of energy storage system research and development, the development of the optimization and testing, the programmable input and feedback system of the demand is higher and higher.Now, more and more energy to be stored, so the dissipative reaction heat loss is no effective alternative.Most of the energy feedback device supplier provides two schemes, one is to provide two parts one is used to output energy to feedback, additionally one kind is integrated components, provide the main data set.And two-way power is large and important system of power transmission.REGATRON now released a new concept TC GSS series products: TC GSS was the first fully digital operation of the power supply equipment, it can offer two energy flows at the same time, the output to the load, and energy feedback is from the load at the same time.Our TOPCON power supply is already fully validated, integrates the function of the new feedback topology, and has function of PFC.Through the base power integration can provide fine grading system, from 20 kw to 224 kw power can achieve.Modular design allows different system at any point in time with the minimum energy loss.Through simulation battery, the method of using electronic power supply to replace a real power battery and can handle the direction of energy flow at the same time.Simulation research using the TopConTC. GSS technology has opened up to define nearly all of the different cell system on electrical properties.TC GSS can simulate a power supply, battery system element to the transmission system for development and testing job.To load test run, the TC GSS parameter setup is very simple (rated voltage, maximum current and internal resistance) or greater complexity (simulation system and the parameters of a very detailed energy source).According to the above, can carry on the investigation and analysis: - the stability of the drive system, speed, efficiency and dynamic performance - usually in overvoltage conditions - long running and the characteristics of thermal management system - such as emergency stop to deal with abnormal situation, interrupt communication, complete the bidirectional power flow properties of thermal runaway makes TOPCONTC. The GSS as a complex system is installed on the ideal power source, the device not only consists of power consumption of parts, and the power supply components as generators, charger, etc.According to the above, under the condition of different "battery", performance and stability of this device is in an integrated airborne system debug, TOPCONTC. GSS can free programming.TopConTC GSS is a very compact, modular high power source/sink system, adopt advanced technology of PFC source schema and rapid self synchronization, the islands of the regeneration technology of check the power supply positive feedback.Comprehensive parameterized possibility and a variety of operating mode, can adapt to the complex load.Closed "TopControl" run and test software, can be in the running state operating parameters and set all the important value and process related data.TopConTC. GSS along with "BatSim" and "BatControl" application software is an advanced tool that can satisfy all the alternatives and energy storage battery system testing purposes.Highly flexible programmability and adjustable parameters, can be simulated in this area the task of almost all imaginable.System is different from competitors, TC GSS system is completely independent power supply, the user to select from any module system, any power supply tasks, such as charging and discharging, work as an independent power supply system.

Cell simulator is to point to: battery simulator is designed specifically for the new energy of the electric car industry motor controller, drive motor, the vehicle test experiment research and development, to replace the power battery equipment.Giving back to the grid is to point to: advanced IGBT device, phase and amplitude control PWM algorithm can be used to improve the deceleration braking ability of frequency converter, the motor at the same time in the process of our brake and input to the inverter energy feedback to the electricity grid to meet effective inverter braking at the same time, to more than 95% of the renewable energy recycling.I know a battery (below) is introduced to help to you!A, product introduction day tao TES galaxy series battery (capacitance) simulator is a high power factor and high precision programmable IGBT type battery (capacitance) simulator.Using full digital control, high control precision, fast response speed, output the adjusting range is extensive.Have the double function power battery simulation, the precision for feed, widely used in battery charging and discharging test, charging pile testing, the electric car motor, transmission system, powertrain test, etc.System with AC - DC, DC - DC two-way transformation two level structure, can effectively smooth busbar voltage in a sudden and dump load fluctuations, so as to improve the dynamic response time of the machine output.AC - DC two-way transformation by four quadrant SPWM rectifier technology, bidirectional energy flow and power factor as high as 99% above, grid harmonic pollution is small.DC - DC two-way transformation using high frequency circuit, the output response is fast, high precision.Can according to user needs comprehensive simulation volt-ampere characteristics of all kinds of battery pack, flexible test of battery power supply equipment.;Electric vehicle drive system, power always bearing system test low when motor, controller for electric vehicles drive system for electric vehicles, power always bearing system test low ship electric drive, electric drive system test low low motor system charger, rechargeable pile test low low energy storage system for converter battery, battery charging and discharging test;Capacitor, super capacitor charging and discharging test * * UPS, EPS system dc panel system test low replace ordinary dc power as alternative power low real batteries testing TES series battery (capacitance) simulator has significant advantages for the following five:

, using the parallel of the power unit, the national patent technology, a battery simulator is made up of two or more independent units, each unit can be used independently, can use series-parallel again: as a single module is 800 v, 800 a, use two modules in series is 1600 v, 300 a, parallel use 800 v, 600 a.

, dynamic response (voltage), the company's unique patented technology, makes the intermediate dc bus can changes over the output voltage, namely when output 800 v dc bus is among about 900 v, and when the output of 50 v intermediate fell to 100 v dc bus automatically.In other companies the minimum output voltage 800 v battery simulator can generally stable output to about 150 v, and output volatility, the efficiency is low.My company's patent technology can guarantee between 20 v - 1600 - v can be smooth and efficient output, and the full range of excellent quality of output waveform.

, galaxy day tao battery simulator, built-in protection unit energy consumption, when feedback energy, automatic cut to energy dissipation module, thus ensuring the stability of the entire system.

, perfect protection function: pool simulator has over voltage, over current, overload, over temperature, lack of equal fault protection.Protect the programmable parameters, output voltage can be set limit, protect the security of the subjects to taste.The over voltage, over current, overload, thermal breakdown adopts two level threshold processing method, when low threshold failure send out sound and light alarm signal, and limit the output;When reach high fault threshold value issued an urgent sound and light alarm signal, and take immediate steps to brake, lower output, start the emergency brake, to achieve the safety threshold, then stop the output.

Isolation, safe and reliable, and power grid, will have any interference with other devices of power grids.

Cell simulator is to point to: battery simulator is designed specifically for the new energy of the electric car industry motor controller, drive motor, the vehicle test experiment research and development, to replace the power battery equipment.Giving back to the grid is to point to: advanced IGBT device, phase and amplitude control PWM algorithm can be used to improve the deceleration braking ability of frequency converter, the motor at the same time in the process of our brake and input to the inverter energy feedback to the electricity grid to meet effective inverter braking at the same time, to more than 95% of the renewable energy recycling.I know a battery (below) is introduced to help to you!A, product introduction day tao TES galaxy series battery (capacitance) simulator is a high power factor and high precision programmable IGBT type battery (capacitance) simulator.Using full digital control, high control precision, fast response speed, output the adjusting range is extensive.Have the double function power battery simulation, the precision for feed, widely used in battery charging and discharging test, charging pile testing, the electric car motor, transmission system, powertrain test, etc.System with AC - DC, DC - DC two-way transformation two level structure, can effectively smooth busbar voltage in a sudden and dump load fluctuations, so as to improve the dynamic response time of the machine output.AC - DC two-way transformation by four quadrant SPWM rectifier technology, bidirectional energy flow and power factor as high as 99% above, grid harmonic pollution is small.DC - DC two-way transformation using high frequency circuit, the output response is fast, high precision.Can according to user needs comprehensive simulation volt-ampere characteristics of all kinds of battery pack, flexible test of battery power supply equipment.DSP+ARM;Electric vehicle drive system, power always bearing system test low when motor, controller for electric vehicles drive system for electric vehicles, power always bearing system test low ship electric drive, electric drive system test low low motor system charger, rechargeable pile test low low energy storage system for converter battery, battery charging and discharging test;Capacitor, super capacitor charging and discharging test * * UPS, EPS system dc panel system test low replace ordinary dc power as alternative power low real batteries testing TES series battery (capacitance) simulator has significant advantages for the following five:

Using parallel of power unit, the national patent technology, a battery simulator is made up of two or more independent units, each unit can be used independently, and can use series-parallel: such as a single module is 800 v, 300 a, the use of two modules in series is 1600 v, 300 a, parallel use 800 v, 600 a.

Dynamic response (voltage), the company's unique patented technology, makes the intermediate dc bus can changes over the output voltage, namely when output 800 v dc bus is among about 900 v, and when the output of 50 v intermediate fell to 100 v dc bus automatically.In other companies the minimum output voltage 800 v battery simulator can generally stable output to about 150 v, and output volatility, the efficiency is low.My company's patent technology can guarantee between 20 v - 1600 - v can be smooth and efficient output, and the full range of excellent quality of output waveform.

Galaxy day tao battery simulator, built-in protection unit energy consumption, when feedback energy, automatic cut to energy dissipation module, thus ensuring the stability of the entire system.

Perfect protection function: pool simulator has over voltage, over current, overload, over temperature, lack of equal fault protection.Protect the programmable parameters, output voltage can be set limit, protect the security of the subjects to taste.The over voltage, over current, overload, thermal breakdown adopts two level threshold processing method, when low threshold failure send out sound and light alarm signal, and limit the output;When reach high fault threshold value issued an urgent sound and light alarm signal, and take immediate steps to brake, lower output, start the emergency brake, to achieve the safety threshold, then stop the output.

The power system safe and reliable and isolation, will have any interference with other devices of power grids.

The page contains the contents of the machine translation.

*
*
*

Leave a message

Contact Us
Your name(optional)

* Please enter your name
* Email address

Email is required. This email is not valid
* How can we help you?

Massage is required.
Contact Us

We’ll get back to you soon

Done