May 10, 2019 Pageview:893
By the end of April this year, the city has built about 127000 charging piles, which, in shopping malls, transport hub, expressway service area, such as public parking lots, has built about 20000 public charging pile, has formed six ring within the scope of the average public charging network service radius of 5 km.
Public use of charging pile, how? Beijing youth daily reporter recently in multiple charging stations for the on-site visit.
Visit
Fuel car parking Spaces take charge of new energy vehicle owners "wasted"
On May 24, 19, north green newspaper reporter comes to Tongzhou district north commissioner rich water pearl river park near the bridge charging stations.16 dc charging pile cars have parked the car, there are 13 occupied by a fuel car parking Spaces. Who lives nearby Guo told north green newspaper reporter, he has a new energy car, the charging station closest to home, but every time he comes to see new energy car fuel car "occupation".
"Especially in the evening, stop are neighborhood residents fuel vehicle, a stop is a night, want to charge at no. Occasionally see new energy car parked in the parking space, no one in the car. Don't know what time left, the longest inferior for more than an hour before to the owner, had to face the local charge."Mr. Guo said angrily.
A similar situation also happened in Tongzhou Beiyuan Hualian shopping mall underground layer of new energy vehicle charging stations. North green press on May 24, 21 PM to new Hualian shopping mall to see, at charging stations set up on the second floor underground, a total of 16 charging pile. In addition to the six parking Spaces empty, live 10 are parked car parking Spaces, only two of them are charging new energy vehicles, other cars are fuel cars.
"Every weekend here is fuel car parking, often can't filled with luck. Several times to see several charging pile sit idle, but is the fuel cars occupy, wasted no way!"One is to recharge of new energy car owner Mr. Liu said.
Parking space is idle property rental charging pile decoration
May 23 noon, north green news reporter arrived at the great northwest suburb pavilion bridge wide canal Jin Maofu galleria, has more than 60 parking building parking lot, there are 56 parking charging piles installed. In the midst of this, about sixty percent can be normal charging, the charging pile without electricity. North green news reporter at the scene of the visits to see, not a new energy car in this charge, but there are 22 charging parking is fuel car "occupation".
Not only that, the scene all parking lock installed, the foreign car cannot stop. North green newspaper reporter called Jinmao property company, responsible for the region's operator, said all parking Spaces have been leased to the bottom, not open to the public, "if you want to charge here, looking for merchants to negotiate communication!"
North green news reporter immediately find a snack bar, expressed the hope that can charge here. A waiter said: "immediately to the peak dining, can only stop here for dinner. You can ask the bank to the front, there should be room."Subsequently, north green news reporter found the bank lobby manager, the other party, said: "to lock the keys have been distributed to employees, I have no way to open."
The stars is this batch of battery pile of building companies. North green newspaper reporters after download APP "star charge", the map shows wide canal Jin Maofu galleria for public parking charging pile, free. On the page, however, there is a striking announcement: "please say that take the door to base business."In evaluating column someone said: "the original block placeholder, don't let into the now."
Charging equipment failure into owners complaints focus more
Charging pile failure no repair is also a big obstacle to a new energy vehicle owners charging.P + R parking lot in Tongzhou Beiyuan metro station, north green news reporter saw, the parking lots set up 24 charging pile, four dc charging pile, 20 exchange charge. The scene only two new energy car parked on the dc charging pile space, 22 other charging pile is free. Discovered, but near the ac charging pile are a black screen, do not display any data, unable to charge.The screen while the other two dc charging pile on, but the screen shows: "equipment suspended services, please choose other devices."
The parking lot of a staff member to north green news reports revealed that the slow charging posts here are bad."It is said that the machine is out of order, such as spare parts, after the repair, but I failed. Charge fewer people here, it is because most of the equipment is broken. You want to charge, went down to the supermarket in front of the bottom charge, there are also charging pile."The staff said.
On the phone APP, charging pile failure also become the focus of owners complaints, even for a long time can't repair it charging equipment. Some said: "try a few piles are not filling it with electricity, white to pay a lot of parking."
In addition, the north green newspaper reporter also learned that the public has charge gun pile are more prominent, the screen is damaged, and so on and so forth.
Voice
City Management Committee
Fuel car parking, owner of rigid demand lead to the low utilization rate, etc
Beijing urban management committee oil (gas) station integrated management relevant controller introduces, at present this city built around 20000 in the field of social public utilities charging pile, in shopping malls, supermarkets, parks, scenic spots, transportation hub, and parking transfer, expressway service area and another public parking lot. But, according to the statistics, the average daily use public charging pile length accounted for only 6% to 7%, the rest is idle most of the time.
The head said, at present, most of the public charging pile is new in the original parking charging infrastructure, rather than the specially designated electric car parking Spaces. Urban areas in the city residential parking space gap total to 1.29 million, the more populated area, the activity of parking resources competition more intense, new energy vehicles and fuel car parking conflict would be revealed.
In addition, new energy vehicles of public charging pile of rigid demand are not strong. By the end of April this year, the city has built about 127000 charging piles, provide service for 178000 new energy car. Personal use of new energy vehicles 119000 vehicles, and the matching, personal fixed parking space in residential quarters has built about 90000 for charging pile, that means 75% of the private cars can charge in the neighborhood. For charging pile becomes the most main way of charging cars. Public charging pile, by contrast, is the "AIDS", have the effect of "temporary repair electricity".Moreover, residents for charging less than 5 cents per kilowatt-hour, public charging pile to a service charge of electricity and, on average about 2 yuan per kilowatt-hour, parking fees are not included in this, the price difference also causes of public charging pile rigid demand.
Charging pile operating enterprise investment
Need to continue to improve the quality and quantity of charging pile
Stars charge accumulated investment operations in Beijing for more than 3000 charging piles, the market share is bigger. Responsible for charging star investment operations among all nations in the new energy investment group, senior vice President of Zheng Juan said, early infrastructure construction is very necessary. To develop the market, to better promote the new energy vehicles.
Zheng Juan a thought, in the present case, still to maintain the good, the infrastructure construction is still in a "deep trench, wide accumulate grain" stage, the need to continue to improve the quality and quantity of charging pile, optimizing space layout, the owner of charging anxiety to a minimum. At the same time, new energy vehicles, strengthen no longer rely on government subsidies, make consumers want to buy.
"Someone willing to buy new energy vehicles, and have enough convenient charging pile, new energy car ownership will continue to grow. We have done a calculation, predicts 2022, charging pile operators can make a profit."Zheng Juan said today (Monday).
Move
This city will be defined electric vehicles dedicated berth
Effective as of this month the Beijing motor vehicle parking regulations explicitly put forward: "the electric car electric vehicles dedicated berth. Against the rules, by the traffic administrative department of the public security organ shall be ordered to correct, penalties shall be imposed in accordance with the law."North to the reporter understands, relevant government departments will negotiate research, in the future to carry out the "dedicated berth designated the electric car" requirements.
In addition, some charging pile construction, head of the operating companies, called for in the parking conditions allow, fuel owners should try to avoid to take up parking charging pile installation, to recharge provides convenient new energy vehicles. At the same time, the new energy vehicle owners should also care for the charging infrastructure, create a good environment for the normal charge.
The page contains the contents of the machine translation.
Leave a message
We’ll get back to you soon