Charging pile type introduction
First, let's introduce the current types of charging piles. There are two types:
1. Fast charging pile: The charging time of the fast charging pile is between 20 minutes and 60 minutes. The charging pile comes with a large charging line.
2. Slow charging pile: The charging time of the slow charging pile is between 6 hours and 8 hours. The charging pile charging line is assembled in the trunk of the car and is self-assembled in the charging pile.
The above two charging piles operate similarly, except that the charging line of the slow charging pile needs to be manually connected to the charging pile, and other operations are consistent.
Fast charging pile use method
Today we show you how to use the fast charging pile. First we will cause the cover to open (same as the traditional model), find the charging end of the electric car, open the charging end cover, and then plug the charging post (similar to the refueling gun). Insert into the charging end of the electric car, here you need to remind everyone to be inserted.
Car fast charging port
Charging pile charging port
Charging pile LCD touch screen operation
The next step is to operate the LCD touch page from the charging post. The general steps are as follows:
Remove the fast charging pile charging port
Plugged into the charging port
After the plugged in state
Insert the card you purchased into the charging post
After inserting the power card, enter the LCD operation page.
Enter the six-digit password for your card
When the input is correct, your card information will be displayed and touch Auto Charge (right option)
This page will be displayed after selecting Auto Charge, click OK to start charging.
Then it shows that the charging page is starting.
At this time, the card will pop up automatically, but don't worry about it.
Look to see if the car has started charging, then lock the car model and go
Fast charging electric car , after the charging is completed, the charging pile will be automatically powered off. At this time, you should not settle the bill. If you don't settle the next time, your card will not be used, or you can settle it on this machine before you can use it.
Card is settled after charging is completed
LCD screen display is in progress
After the settlement is completed, the card will pop up automatically, you can walk away.
The above is the quick charging operation analysis. The slow charging operation and the fast charging operation page are the same. The difference is that the slow charging requires manual connection of the charging line, and the electric vehicle charging port is located at the rear side of the vehicle (the tank of the conventional car).
Slow charging pile use method
The slow charging pile connection line is located in the trunk of the car, the long head is inserted into the charging pile, and the short head is inserted into the charging port of the electric vehicle.
Household charging large line adapter, experts do not recommend charging at home, it is easy to cause the line to overheat and can not fill the electric car.